Water Tower

  • NO 4 Water Tower  -
NO 4 Water Tower  -

NO 4 Water Tower -

  • Process:Assembly welding, hot galvanized
  • Size:According to the design
  • Material:GB Q355
  • Design:Provide design services
  • Description: Hangzhou Desen Engineering Co., Ltd .(Desen Steel Structure Service) has been dedicating one-stop solution of steel structure.The service ranges from architectural design,production,transportation,ins
  • INQUIRY   EMAIL

Get a professional quotation for your steel structure within 2 hours,welcome to inquiry.

E-mail:[email protected] Mobile/WhatsApp/Wechat:0086-1358812429

Water Tower

We can design structure of the water tank and water tower according to your needs to provide you with the most economical and safe drinking water solution system.

The FRP combined water tank is a new type of water tank,which commonly used in the world. Its unique performance completely solves the problem that the concrete water tank is heavy, easy to leak and the steel water tank is easy to corrode and the anti-corrosion coating is often off. But the FRP water tank will be no leakage, light weight, good water quality, beautiful appearance, long

service life and convenient installation. And the advantages of the FRP water tank include easy maintenance and cleaning;It widely used in industrial and mining, enterprises and institutions, housing, hotels. restaurants and other buildings.

The water tank seal uses a specially developed custom product - sealing tape. The sealing tape is non-toxic, water-resistant, oxidation-resistant and has good sealing performance, and the service period is more than 30 years.


Product Description

Project Time: Dec. 2017

Project Location: Angola

Water  volume:80m3

Introduction: What is DESEN?
ISO 9001:2009 certificated factory with registered capital CNY 120 Million and 10 years history;
A leading manufacturer and exporter in the field of steel structure , space frame and accessories who has been exported products to more than 30 countries;
A professional global provider focusing on comprehensive solutions including products manufacturing, engineering consultant, drawing designing, logistics transportation, technical supervision and installation construction.


Production equipment


Workshop production

Cutting, assembly, welding, assembly, correction, overall pre-assembly, hot dip galvanizing, packaging, transportation。

Three-dimensional model building and pre-assembly in the workshop can make site installation faster and avoid errors

Products : What can DESEN supply ?
Steel structure ,space frame,coal shed,steel structure water tower ,container house ,Distribution house,double-c-structure
Advantages: Why choose DESEN?
Honesty is DESEN’s best policy;
Mutual benefit and long term cooperation is DESEN’s goal;
Competitive pricing based on own world first class design is DESEN’s unique advantage ;
Strict quality control and punctual shipment schedule is DESEN’s basic guarantee;
FAQ of this One-stop service for steel structure
1.What’s the design code are you adopt?
Answer: Usually we adopt GB 50017-2003/JGJ7-2010 code, however European standard also practice. We offer world-class steel structure and space frame design which have cost effective solution for both steel structure and foundation construction too.
2.What’s the design software are you using?
Answer:MSTCAD, SAP2000, Midas,3D3S,PKPM
3.What’s the drawing software?
Answer: AutoCAD, Tekla etc
4.Are you manufacturer?
Answer: Yes, we are steel structure space frame manufacturer and solution provider as well, and we have world class steel structure and space frame (coal shed) design experience, and follow ISO standard mainly, however ASTM also possible for us.
5.What kind of steel you are using?
Answer: Usually we use middle steel Q235B and high tensile steel Q355B for steel structure and space frame.
6.Warranty years and life time of steel structure and space frame?
Answer: The warranty year is 2 years and lifetime of steel structure and space frame is 50 years.
7.What’s the minimum order quantity would be?
Answer: Minimum order quantity is  1xfull container.
8.What’s the production lead time?
Answer: Usually it will take 1 month for the manufacturing after the PO and down payment.
9.Are you close to the sea port?
Answer: Yes, we are near to the one of the biggest port in the world and it’s the one of our advantage to export the cargos worldwide.
10.How to control the quality?
Answer: We are ISO 9001 qualified since 2009 and treat quality first as our strategy, we do everything which include checking the manufacturing cards, do prototype assembly and counting the each steel members carefully before the shipment and so on, so that we can avoid possible mistake in Client’s side.


R&D Department


Technology center of DESEN was founded in 2010. At present, there are over 10 R & D design and technical engineers, and among them here are 8 national registered construction and structure engineers and 2 senior engineers, forming an experienced and skilled professional team and laying a solid foundation to DESEN's design and technology products.

Inquiry:

CONTACT US

Contact: Abner

Phone: 0086-13588124297

Tel: 0086-571-56683606

Email: [email protected]

Add: Room 1115, Building 24, Yaoshunjiangdongjinzuo, Yipeng Street, Qiantang New Area, Hangzhou, Zhejiang