Congratulations to our company for winning the bid for the 2×350MW thermal power dry coal shed grid project in Morowali Industrial Park, Indonesia. The total weight of the grid frame of the project is 1,800 tons. The horizontal span of the coal shed is 105 meters, the longitudinal length is 250 meters, and the spread area is 33,250 square meters. M, the project is designed, purchased, manufactured, transported, constructed and installed by our company.
The drawing information is as follows
Contact: Abner
Phone: 0086-13588124297
Tel: 0086-571-56683606
Email: [email protected]
Add: Room 1115, Building 24, Yaoshunjiangdongjinzuo, Yipeng Street, Qiantang New Area, Hangzhou, Zhejiang
We chat